In a revision project, unless each detailed design section says whether this revision changes it or not, the scope of implementation and testing gets blurry. tadori lists the sections where this isn't written, and shows exactly which column of which line to fill in.

Rule used
R4 (detailed design), column is filled: the “post-change impact” column of detailed design sections (DD)
Gap found
DD-2.3 “Lending limit check” has an empty post-change impact
Owner and fix
The designer fills in the “post-change impact” column on the DD-2.3 row (line 6) of ledger/items.tsv

1. Write one rule

In the ruleset for the detailed design phase (dd), add a rule saying “detailed design sections have the change column filled”. The kind of check is filled (a column is filled).

id	phase	kind	from	to	field	only	owner	label
R4	dd	filled	DD		change		Designer	Detailed design section states its post-change impact (changes / unchanged / undecided)

2. The ledger holds only the section and what it is based on

The ledger (ledger/items.tsv) holds each section's ID, title, where the original lives, and the basic design chapter it is based on. The design document's content is not copied.

idtitlesourcerefschange
DD-2.3Lending limit checkdocs/detail-design.md §2.3BD-2empty
DD-3.1Handling of return due datesdocs/detail-design.md §3.1BD-3unchanged
DD-3.2Refusing loans while overduedocs/detail-design.md §3.2BD-3changes

3. See the owner and the fix on the remaining work screen

Select the detailed design phase and DD-2.3 shows up as an R4 gap, along with the owner (the designer) and which column of which line of which file to fill in to close it. The md icon opens that row in md-business.

The remaining work screen with detailed design selected. It shows the R4 gap DD-2.3 and the fix “write in the post-change impact column of the DD-2.3 row (line 6) of ledger/items.tsv”

4. Check only the sections that change in the next phase

Sections whose post-change impact is “changes” should be referenced from a commit in the implementation phase. The rule's only column narrows the target to the sections that change. tadori won't demand commits for unchanged sections and produce gaps that exist only for show.

R6	impl	covered	DD	COMMIT		change=changes	Developer	Detailed design sections that change are referenced from a commit

5. Fix it, then check again

When the designer writes “changes” (or another value) for DD-2.3 and saves, the screen redraws on the spot. Running tadori check --log records the result in the check log (who, what, when, where, why, how). Rows that were gaps in the previous check are marked “resolved” on the trace screen. Confirming that it's fixed is up to a person.