Septic system site plan (fictional)
Septic site plan: a plan decided by how fast water leaves the soil
This drawing comes from one YAML file. No shape was moved by hand.
Notes in the source (in Japanese)
A plan drawing decided by something vertical —— how fast water leaves thesoil. The perc test gives the loading rate, the bedroom count gives the designflow, and together they give the trench area that the plan then arranges.
The reserve area is drawn and kept empty —— and it keeps the same well setback as thefield in use, because one day it will be the field in use. A drainfield is a consumable;the next one has to have somewhere to go.
Sizes, soils and setbacks are fictional; local health codes decide them.
Source (YAML)
examples/gallery/152-Septic-site-plan.zumen.yaml
More in this field
A two-bedroom apartment plan with room dimensions, which way each door swings, and where the wet rooms and storage sit
A reinforced concrete framing plan for a second floor, with the grid lines and the mark of every column, girder, beam and slab
School floor plan (walls, door swings, grid lines, dimensions)
A farmland consolidation plan laying out 30-are plots, with the irrigation channels, the drainage channels and the farm roads that serve them
The plan of a concrete gravity dam: the body, the spillway, the intake works and the access road for maintenance
Site logistics plan with the crane radius
The typical floor of a business hotel with nine rooms, a central corridor, two direct stairs, and two lifts with their hall
A surface car park set out for fourteen cars, with bay dimensions, aisle width and where the entrance and exit sit